Add
To schedule Stack calibration.
To define Stack analyzer calibration:
1. Click on Calibration then Stack analyzer and then Add
2. Select Plant and Device and click on Submit
3. It will open the page as shown below:
- Enter schedule name
- If Default checkbox is clicked, this schedule is shown by default on user initiated calibration screen.
- Select the variable (to initiate calibration)
- Due Date and Time: Select first due date and time. After this calibration will be initiated after defined interval
- Interval {Days}: Frequency of performing calibration in days.
- Duration {Min}: Duration of calibration in minutes.
- State: If checked, calibration schedule is active and calibrations are initiated. If unchecked, calibrations are not initiated
- Check list: This is place holder for adding a checklist which is displayed on user initiated calibration screen, User is supposed to ensure all points in checklist before initiating calibration
- Factor1 and Factro2: Not used
- Enter the Sequence Steps details as required:
State: Use to enable/disable the step.
Time: The minute (from the beginning of calibration) that this step will start. Start with 0 if command should be sent when the calibration sequence starts.
Mode: Zero/Span/Sample. This indicates whether the step is for Zero mode (0 concentration of particular parameter in controlled gas) or Span mode (full or 100% of calibration scale concentration of particular parameter in controlled gas) or Sample mode (calibration is complete and analyzer now gets the emissions which it is measuring)
Select Operation: Operation to be performed in this step. Available operations are
Write variable: For this operation, user has to select a variable in next drop down and select its value in text box. System will write this value in analyzer when this step is executed.
Analyzer Command: Enter the command to be sent to analyzer in text box.
5. Click Save.